Development

Planning and
Environment Approvals

Equis is currently undertaking surveys, assessments and impact studies in accordance with the Planning Act 2016 (Qld) (State Code 23) and Environment Protection and Biodiversity Conservation Act 1999 (Cth).

Equis completed its first community drop-in session on the 21st of September 2024 at the Noonga Hall & Recreation Grounds in Jackson North, QLD. For material presented at the drop-in session, please click the link below.

Jackson North

Community
Drop-In Session

Serviced Households/Yr

Up to 362,000

Direct Operational Jobs

16

Direct Construction Jobs

350

Operation
2030
Commissioning
2030
Construction commencing
2028
Project
approvals
2026-2027
Planning and design
2023 - 2025

Get in touch

Equis Australia

The Jackson North Wind Farm will showcase the coexistence of world class agricultural, traditional energy and renewable energy infrastructure.

Equis is developing up to 600MW of wind power generation and 200MW of storage capacity near Woleebee to provide Queensland with reliable clean power and support emissions reduction targets

Jackson North Wind Farm

Woleebee,
Queensland


The proposed Jackson North Wind Farm is located approximately 35 km from south-west of the town of Wandoan, in and around operational gas fields in the Surat Basin and adjacent to the 275kV Wandoan South Substation.

Jackson North Wind Farm intends to connect to Queensland’s electricity network via a transmission line connecting into the 275kV Wandoan South Substation.

Jackson North Wind Farm is expected to commence operations by 2030.

About the
project

Development

Planning and
Environment Approvals

Equis is currently undertaking surveys, assessments and impact studies in accordance with the Planning Act 2016 (Qld) (State Code 23) and Environment Protection and Biodiversity Conservation Act 1999 (Cth).

Equis completed its first community drop-in session on the 21st of September 2024 at the Noonga Hall & Recreation Grounds in Jackson North, QLD. For material presented at the drop-in session, please click the link below.

Jackson North

Community
Drop-In Session

Get in touch

Equis Australia

Jackson North Wind Farm

Equis is developing up to 600MW of wind power generation and 200MW of storage capacity near Woleebee to provide Queensland with reliable clean power and support emissions reduction targets

Direct Construction Jobs

350

Operation
2030
Commissioning
2030
Construction commencing
2028
Project
approvals
2026-2027
Planning and design
2023 - 2025

The Jackson North Wind Farm will showcase the coexistence of world class agricultural, traditional energy and renewable energy infrastructure.

Direct Operational Jobs

16

Serviced Households/Yr

Up to 362,000

Woleebee,
Queensland


The proposed Jackson North Wind Farm is located approximately 35 km from south-west of the town of Wandoan, in and around operational gas fields in the Surat Basin and adjacent to the 275kV Wandoan South Substation.

Jackson North Wind Farm intends to connect to Queensland’s electricity network via a transmission line connecting into the 275kV Wandoan South Substation.

Jackson North Wind Farm is expected to commence operations by 2030.